
Tuesday, June 14, 2011
Urban Nation: Why We Need to Give Power Back to the Cities to Make Canada Strong

The Design Advisory Panel's Role in City Decision Making
In this context, these Terms of Reference identify a mandate for the Design Advisory Panel. The mandate is an invitation to the City's design community to become involved in moulding on-going developments to meet the unique urban design environment of Nanaimo. The Design Advisory Panel’s primary objective is to review Form and Character Development Permit applications and provide advice by way of recommendations to staff in its negotiations with applicants.
The review of these applications has been underway for a considerable amount of time, with one application currently approved and all been considered by the City’s Design Panel on several occasions. I have been advised that both Staff and the Design Panel are recommending that Council approve the developments as proposed.
Could Supermarket Parking Lots Become Public Squares? Or be Re-designed as Great Public Places in Other Ways?
Email Thread with Planners Noble, Tucker re Mayor's Memo: Port Place Mall
Frank
On 26/05/2010 11:52 AM, Andrew Tucker wrote:
Frank,
You are incorrect. The development permit for 9 Nicol Street (DP613) does not require Council approval. It meets the requirements of the Zoning Bylaw with only one minor variance (which is less than 50% of the required standard). The required building setback is 4.5 metres fronting Nicol Street. The proposed building siting is 2.3 m. (7.58 ft.) from Nicol Street. The proposed setback variance is less than 50 % of the bylaw standard so the DP will be signed off by the General Manager of Development Services.
Section 920 of the Local Government Act provides the statutory authority for the issuance of DPs including the option for Council to delegate its authority. Development Permits (DPs) are not like rezoning applications where a change in use or density is requested. Instead, the legislation for DPs does not require any public process in their approval and stipulates that DPs can only address the general form and character of the proposed building and not particulars of exterior design and finish. Case law has confirmed that the discretion of Council is extremely limited with regards to DPs and that Council cannot refuse to issue a DP for design elements.
Under the City’s delegation by-law (Bylaw 7031), the General Manager of Development Services is delegated the authority to approve the DP. The process by which this occurs is that, following acceptance by the Design Advisory Panel, the application is posted for 5 days in the Councillors’ office for their review and information and then signed off by the GM Development Services. Approximately 64% of all DP applications received by the City are approved by the GM of Development Services following posting.
I trust this clarifies the processing of development permits for you.
Andrew Tucker MCIPDirector of PlanningCity of Nanaimo>
From: Frank Murphy [mailto:frankmurphy@shaw.ca]
Sent: Tuesday, May 25, 2010 11:09 AM
To: Gary Noble
Cc: Jeremy Holm; Andrew Tucker; Ted Swabey
Subject: Re: Mayor Ruttan's memo
Thanks Gary --
I want to be sure I have this right. No need to reply on this unless I'm incorrect that:
Your are referring to DP000613 at 9 Nicol Street. It will require Council approval before it can proceed.
- Frank
>
On 25/05/2010 8:44 AM, Gary Noble wrote:
Good morning Frank,
This project has been reviewed and accepted by the Design Advisory Panel. We are awaiting Min. of Environment (MOE) approval under contaminated site legislation. This should be available shortly. With MOE approval the project will be posted for Council review and approval.
Gary Noble MCIP
>
From: Frank Murphy [mailto:frankmurphy@shaw.ca]
Sent: Sunday, May 23, 2010 1:26 PM
To: Gary Noble; Ted Swabey; Andrew Tucker
Subject: Mayor Ruttan's memo
Hi Gary -- Can I ask you to clarify for me something in Mayor Ruttan's reply to my request re consulting architect Franc D'Ambrosio on the Port Place Mall redevelopment and rezoning applications?
The Mayor's memo states that, "The construction of the Commercial Rental Unit on 9 Nicol Street can proceed to construction as soon as the owner would like to start." Does this application not require Council approval? Has it been approved by Council at this point?
Thanks --
Frank
www.nanaimocityhall.com
Email follow-up to Mayor Ruttan: Port Place Mall Redevelopment Plans
Thanks, Mayor Ruttan, for your reply to my request to seek the input of architect Franc D'Ambrosio, author of the award-winning City of Nanaimo Downtown Urban Design Plan and Guidelines, as you review the Port Place Mall redevelopment applications. A quick follow up if you'll permit me.
redevelopment of a site of such importance especially to residents of the city centre and south end neighbourhoods.Your detailed note helped me understand better a number of the complexities involved in these applications. In honesty, though I'm unable to understand how it could be detrimental to you or your colleagues on Council to include Mr D'Ambrosio's perspective in your decision-making on the
I can tell you – while at the same time I urge you to contact Mr. D'Ambrosio directly – that he has voiced concerns about the redevelopment and rezoning applications.
He has also cautioned me to be respectful of and sympathetic to how difficult and complex these decisions can be for City Councils and Planning Departments. There's a number of conflicting interests at work and it falls to you folks to make the best decision possible.
Among Mr. D'Ambrosio's concerns is this redevelopment proceeding in the absence of a comprehensive plan that includes the future redevelopment of the waterfont lands to the immediate south of this site.
An auto-oriented mall that one might find in suburban neighbourhoods risks segregating this site from the charming winding European-style street grid to its immediate north. There's such an exciting opportunity here to take a great step forward in the planning and development of our downtown.
I have great respect for the investment being made here in our downtown by First Capital. I continue though to wonder if this shopping mall model is in their or the City's longer term best economic interest . Is the highest and best use for this site an expanse of “free parking”?
You refer in your memo, Mayor Ruttan, to “...the interconnection of Terminal Avenue and Front Street with a new access road has formed a fundamental starting point for the redevelopment plan...” Perhaps you could ask Planning Staff to clarify this for me. Are we establishing here a privately owned road? Are privately owned roads good public policy?
Lastly, some anecdotal feedback on how important this site is to Nanaimo residents and how involved they feel they've been able to be in this process. The 3 neighbourhood associations that represent the thousands of shoppers that frequent Port Place have expressed concerns re difficulty finding information and opportunities to provide input, as well as reporting large numbers of queries from their members. Also on the new website NanaimoCityHall blog (You may not be eager to accept feedback from a blog. They have not in general distinguished themselves as sources of reliable, objective information, though we have higher aspirations for this one.) by far the highest readership and number of links clicked has had to do with the Port Place Mall redevelopment applications.
I will, as you suggest, continue to follow this process with great interest.
Mayor Ruttan's Reply to Request to Consult Architect D'Ambrosio on Port Place Plans
May 10 ,2010
I want to acknowledge receipt of your email and request to retain Frank D’Ambrosio for a third-party review of the Port Place Mall redevelopment plan.
As you may or may not know, the redevelopment plan includes the following applications:
1.Rezoning to permit a high-rise residential tower (application received: 2009-Jun-02).
2.Development Permit to authorize the construction of a freestanding Commercial Rental Unit on 9 Nicol Street (application received: 2009-Jun-02).
3.Development Permit for the overall mall redevelopment plan (application received: 2009-Jun-02).
This is an extremely complex redevelopment plan, especially given the owner’s attempt to accommodate existing anchor tenants (i.e. Thrifty Foods, London Drugs) and the practicality of retaining significant on-site infrastructure, such as the above-ground parkade. The owner has made a concerted effort to balance the needs of the tenants and existing infrastructure against the City and provincial policies and regulations in the creation of the redevelopment plans.
Many trade-offs have been made by the owner to address elements of the City’s downtown Urban Design Plan and View Corridors policies, and to deal with provincial access requirements. In particular, the interconnection of Terminal Avenue and Front Street with a new access road has formed a fundamental starting point for the redevelopment plan and goes a long way to addressing the “de-malling” of the site.
The review of these applications has been underway for a considerable amount of time, with one application currently approved and all been considered by the City’s Design Panel on several occasions. I have been advised that both Staff and the Design Panel are recommending that Council approve the developments as proposed. It is my understanding that the overall development permit application and rezoning application will be ready for Council’s consideration in the near future. The rezoning application, in particular, will allow for input from the public, as part of the Public Hearing process. The construction of the Commercial Rental Unit on 9 Nicol Street can proceed to construction as soon as the owner would like to start.
We are extremely appreciative of the owner’s vision for the mall and their commitment to the City’s downtown redevelopment. I am confident that both Staff and Council’s Committee system have provided the necessary evaluation and adequate review process for this project.
I am not supportive of a third-party review at this time. The application has been through a full and proper technical review and it is time for Council to consider the merits of approving the application as presented. Thank you for your interest in this project and I would encourage you to keep involved as Council considers the owner’s request for rezoning and development permit approvals.
John RuttanM A Y O RECS/hpProspero: DP613/DP614ec: Council MembersAl Kenning, City ManagerDouglas Holmes, Assistant City Manager and General Manager, Corporate ServicesAndy Laidlaw, General Manager, Community ServicesEmail re Port Place Mall to Mayor Ruttan; Council; Planners Swabey, Tucker. May 10, 2010
I am an enthusiastic fan of your award winning document Downtown Design Guidelines. (The Planning Institute of BC's 2009 highest honour) This plan and its guidelines approved and adopted by Council were to serve as a "living" document that was to be implemented when redevelopment was initiated in the downtown core.
I've been following with interest the opportunity that's arisen to work with the property owner (First Capital Realty Inc.) on the redevelopment of the Port Place Mall property. I appreciate the fact that this property owner has made a considerable investment in our city, having purchased the strata ownership of the commercial space in the Port of Nanaimo Centre and holds other Nanaimo commercial properties including Longwood Station and a portion of the Terminal Park shopping plaza. I'm sure you agree that the chance to redevelop a site of this key importance to the City might come along once in 25 years. It's so important for all concerned, including of course the developer, that we get it right.
I recently inquired as to the status and timelines of the redevelopment and rezoning applications and Director, Planning Andrew Tucker informed me that they are on hold as the proponent wishes to make alterations to both sets of plans already submitted. I also asked if Victoria architect Franc D'Ambrosio whose firm authored the Downtown Design Guidelines had been brought into the process of these redevelopment and rezoning applications. Andrew replied that Mr. D'Ambrosio was not currently under contract with the City and had not been consulted.
It occurred to me that I could approach Mr. D'Ambrosio and ask his thoughts. To my great pleasure Mr. D'Ambrosio was willing to discuss this. I found him to have a sincere and knowledgeable interest in the success of our downtown and a unique and detailed appreciation of both its problems and its potential. He wondered if, given the delay in these applications, it isn't time for a sober second thought.
With respect, and as formally as is possible using this channel, may I request that architect D'Ambrosio be approached by Mayor Ruttan and/or Director of Planning Andrew Tucker for his uniquely well-informed input into the development of this key site?
Thanks in advance for your attention to this.
Port Place Mall Redevelopment
Here’s what the Downtown Design Guidelines has to say about this precinct which it refers to as Harbour Park – (emphasis mine)
This study area makes up most of the Harbour Park precinct and forms the south gateway to downtown. It is close to the waterfront and both the Protection and Gabriola Island ferries. Higher density development, including tall buildings, is appropriate in this area.
URBAN DESIGN STRATEGIES
Recommend 3 m front setback / build-to line. Allow 8 storeys for projects (or tall buildings as permitted) with underground parking at key landmark locations (see Design Guidelines for Tall Buildings). Roundabout feasibility and design will require Ministry of Transportation input.
1. Create transit exchange at the centre of the development. This is an opportunity to create an excellent shared roadway (see Urban Design section).
2. Create pedestrian plaza oriented toward waterfront. Improve linkages to waterfront walkway system, ferries, and the Commercial Street area.
3. Create dramatic gateway view from Nicol Street with single lane or double lane roundabout at Terminal Avenue with water feature or other sculpture incorporated into the design.
4. Create single lane or double lane roundabout at Front Street as landmark northeast of the development.
5. Mixed-use development with ground floor retail and residential or offices above. Six to eight storeys with service lanes between buildings. Buildings define street edge and create landmark for South Gate down Nicol Street.
6. On-site surface parking eliminated. Off-site parallel parking incorporated into streetscape. Potential underground parking, access mid-block towards Cameron Road.
7. New development along Lois Lane and Terminal Avenue to complete street edge definition and frame South Gate.
8. Port Way comprehensive development. Ground floor commercial with residential above. Define edge of Front Street and create axis into the new central plaza.
In general, here’s the Design Guidelines on parking:
Vehicle Parking
Underground parking is preferred. Surface parking, if necessary, should be located at the back of the site. On-site parking in front of a building, is not permitted.
• Shared driveways are encouraged to minimize interruption to the pedestrian realm. • Parking lots should be visually screened from bike pathways and sidewalks by way of walls, fences or landscaping. • Surface parking areas should be divided into sections with landscaped dividers between every 4 to 6 spaces. In addition to providing shade, a canopy of trees through the lot will help break down the scale of large surface parking areas and screen them from high level views.
• Above grade parking structures should provide habitable space along the perimeter. • Locate parking accesses away from pedestrian entries and intersections.
What do you think? If you think a suburban shopping mall floating in a sea of parking stalls doesn’t contribute to a human scale, pedestrian-friendly downtown, let the Planning Department and City Council know.
Monday, June 13, 2011
Nanaimo: the Cultural Capital of Canada (!)
From NanaimoCityHall blog May 26, 2010 at 2:06 pm
An area I’d like to see developed on the blog is in the general area of what can be broadly described as “culture”. It came to mind recently when I was reading the Daily News report about the consultants report to the new Economic Development Commission (Nanaimo needs an identity if it wants to grow, economic consultants say). It occurred to me that the question to ask is how can a modern little city have lost its identity? Do they think identities are something that can be thought up by committees?
What’s called culture in Nanaimo is a top-down affair funded mostly by City Hall. Remember the “Nanaimo: Cultural Capital of Canada” embarrassment?
Here’s what you have when you have a healthy organic cultural scene: ferment. A rich, interconnected scene cross-pollinating. I’d suggest it’s part of a broader problem here and in similar cities which are the result of planning decisions made over the last several decades that tend to separate us — where we live, from where we work, study and interact. You recognize it immediately when for instance you might find yourself in a “College Town” where the campus wasn’t built out in the suburbs, the downtown didn’t go into the kind of decline we’ve seen here; cafe’s and galleries and theatres are a part of the every day life of the locals, not contrivances designed to charm tourists. The irony being of course that tourists are more charmed by the authentic than the contrived (San Francisco, Halifax come to mind).
Comments here